Physical Education Building: Recent submissions
Now showing items 21-30 of 30
-
Empty Poolcirca 1981The Brock pool as it begins to be filled with water.
-
Filling the Poolcirca 1981Herb de Bray next to the pool being filled.
-
Herb de Braycirca 1981Herb de Bray standing in the yet to be filled Olympic sized swimming pool.
-
Pool Planscirca 1981Herb de Bray standing at the edge of the soon to be completed pool of the Eleanor Misener Aquatic Centre.
-
Artist's Sketchn.d.An artist's sketch of what the Physical Education Building was to look like.
-
Physical Education Complexn.d.View from just outside the front of the Physical Education Complex. This area is now part of a courtyard found in the centre of the Walker Complex.
-
Physical Education Complexcirca 1980Exterior view of the Phys. Ed. Complex after the 1980 Aquatic Centre Addition. The Eleanor Misener Aquatic Centre, which contains Brock's Olympic size swimming pool, is the large structure in the foreground. The remaining buildings in the background house the gymnasiums and other facilities.
-
Physical Education Constructionn.d.Construction of the Physical Education Building progresses.
-
Physical Education Centre Early Groundwork1971-10-21Early groundwork at the site of the Physical Education Building. The photograph is stamped with the following: "Physical Education Centre, Architect: moffat moffat and kinoshita, Contractor: newman bros., Date of Exposure: 21 Oct 71."