• Login
    Browsing Physical Education Building by Title 
    •   Home
    • Archives & Special Collections
    • University Archives
    • Architecture
    • Physical Education Building
    • Browsing Physical Education Building by Title
    •   Home
    • Archives & Special Collections
    • University Archives
    • Architecture
    • Physical Education Building
    • Browsing Physical Education Building by Title
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of BrockUCommunitiesPublication DateAuthorsTitlesSubjectsThis CollectionPublication DateAuthorsTitlesSubjectsProfilesView

    My Account

    LoginRegister

    Statistics

    Display statistics

    Browsing Physical Education Building by Title

    • 0-9
    • A
    • B
    • C
    • D
    • E
    • F
    • G
    • H
    • I
    • J
    • K
    • L
    • M
    • N
    • O
    • P
    • Q
    • R
    • S
    • T
    • U
    • V
    • W
    • X
    • Y
    • Z

    xmlui.ArtifactBrowser.ConfigurableBrowse.view

    Sort by:

    Order:

    Results:

    Now showing items 1-20 of 30

    • List view
    • Grid view
    • title
    • issue date
    • submit date
    • ascending
    • descending
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
      • Thumbnail

        Aquatic Centre Concrete Forms

        circa 1980
        Forms and reinforcing steel bars used in the walls of the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Construction

        circa 1980
        Pouring the concrete in the construction of the Eleanor Misener Aquatic Centre.
      • Thumbnail

        Aquatic Centre Excavation Work

        circa 1980
        Construction work taking place at the site of the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Foundation

        circa 1980
        The steel, rock, and conrete foundation of the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Foundation and Pillar work

        circa 1980
        Work on the foundation and pillars of the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Foundation Work

        circa 1980
        Work on the foundation for the Aquatic Centre around 1980.
      • Thumbnail

        Aquatic Centre Pillars

        circa 1980
        Work on the giant concrete pillars found in the Eleanor Misener Aquatic Centre.
      • Thumbnail

        Aquatic Centre Steel Reinforcing Bars

        circa 1980
        Steel reinforcing bars used in the construction of the walls for the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Structural Work

        circa 1980
        Construction on the Aquatic Centre progresses and concrete walls go up.
      • Thumbnail

        Aquatic Centre Wall and Pillar Construction

        circa 1980
        Construction of the concrete walls and pillars for the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Wall Construction

        circa 1980
        Pouring the concrete during the construction of the walls for the Aquatic Centre.
      • Thumbnail

        Aquatic Centre Walls

        circa 1980
        Construction of the concrete walls and pillars for the Aquatic Centre progress.
      • Thumbnail

        Artist's Sketch

        n.d.
        An artist's sketch of what the Physical Education Building was to look like.
      • Thumbnail

        Blueprints

        n.d.
      • Thumbnail

        Brock Pool

        circa 1981
        Olympic size swimming pool in the Eleanor Misener Aquatic Centre.
      • Thumbnail

        Brock Pool

        circa 1981
        View of the pool inside the Eleanor Misener Aquatic Centre.
      • Thumbnail

        The Cage

        n.d.
        The equipment and store room of Brock's Physical Education Complex.
      • Thumbnail

        Eleanor Misener

        circa 1981
        Eleanor Misener was Ralph Misener's wife and it is she that the Aquatic Centre is named after. Ralph Misener was the fourth Chancellor of Brock University.
      • Thumbnail

        Empty Pool

        circa 1981
        The Brock pool as it begins to be filled with water.
      • Thumbnail

        Filling Brock Pool

        circa 1981
        Brock Olympic size swimming pool gets filled with water.
        DSpace software (copyright © 2002 - 2022)  DuraSpace
        Quick Guide | Contact Us
        Open Repository is a service operated by 
        Atmire NV
         

        Export search results

        The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

        By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

        To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

        After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.