Now showing items 1-20 of 30

  • Early Groundwork 

    Unknown author (2009-03-03)
    Early groundwork at the site of the Physical Education Building.
  • Phys. Ed. Construction 

    Unknown author (2009-03-03)
    Construction of the Physical Education Building progresses.
  • Physical Education Complex 

    Unknown author (2009-03-03)
    Exterior view of the Phys. Ed. Complex after the 1980 Aquatic Centre Addition. The Eleanor Misener Aquatic Centre, which contains Brock's Olympic size swimming pool, is the large structure in the foreground. The remaining ...
  • Phys. Ed. Complex 

    Unknown author (2009-03-03)
    View from just outside the front of the Phys. Ed. Complex. This area is now part of a courtyard found in the centre of the Walker Complex.
  • Phys. Ed. Interior 

    Unknown author (2009-03-03)
  • Artist's Sketch 

    Unknown author (2009-03-03)
    An artist's sketch of what the Physical Education Building was to look like.
  • Pool Plans 

    Unknown author (2009-03-03)
    Herb de Bray standing at the edge of the soon to be completed pool of the Elanor Misner Aquatic Center.
  • Herb de Bray 

    Unknown author (2009-03-03)
    Herb de Bray standing in the yet to be filled Olympic sized swimming pool.
  • Filling the Pool 

    Unknown author (2009-03-03)
  • Empty Pool 

    Unknown author (2009-03-03)
    The Brock pool as it begins to be filled with water.
  • Blueprints 

    Unknown author (2009-03-03)
  • Pool Foundation 

    Unknown author (2009-03-03)
    Exposed escarpment rock during the construction of the pool.
  • Foundation Work 

    Unknown author (2009-03-03)
    Work on the foundation for the Aquatic Centre around 1980.
  • Structural Work 

    Unknown author (2009-03-03)
    Construction on the Aquatic Centre progresses and concrete walls go up.
  • Aquatic Centre Pillars 

    Unknown author (2009-03-03)
    Work on the giant concrete pillars found in the Eleanor Misener Aquatic Centre.
  • Concrete Forms 

    Unknown author (2009-03-03)
    Forms and reinforcing steel bars used in the walls of the Aquatic Centre.
  • Aquatic Centre Construction 

    Unknown author (2009-03-03)
    Pouring the concrete in the construction of the Eleanor Misener Aquatic Centre.
  • Steel Reinforcing Bars 

    Unknown author (2009-03-03)
    Steel reinforcing bars used in the construction of the walls for the Aquatic Centre.
  • Wall Construction 

    Unknown author (2009-03-03)
    Pouring the concrete during the construction of the walls for the Aquatic Centre.
  • Excavation Work 

    Unknown author (2009-03-03)
    Construction work taking placce at the site of the Aquatic Centre.