Now showing items 14-30 of 30

  • Filling the Pool 

    Unknown author (2009-03-03)
  • Foundation and Pillar work 

    Unknown author (2009-03-03)
    Work on the foundation and pillars of the Aquatic Centre.
  • Foundation Work 

    Unknown author (2009-03-03)
    Work on the foundation for the Aquatic Centre around 1980.
  • Herb de Bray 

    Unknown author (2009-03-03)
    Herb de Bray standing in the yet to be filled Olympic sized swimming pool.
  • Phys. Ed. Complex 

    Unknown author (2009-03-03)
    View from just outside the front of the Phys. Ed. Complex. This area is now part of a courtyard found in the centre of the Walker Complex.
  • Phys. Ed. Construction 

    Unknown author (2009-03-03)
    Construction of the Physical Education Building progresses.
  • Phys. Ed. Interior 

    Unknown author (2009-03-03)
  • Physical Education Complex 

    Unknown author (2009-03-03)
    Exterior view of the Phys. Ed. Complex after the 1980 Aquatic Centre Addition. The Eleanor Misener Aquatic Centre, which contains Brock's Olympic size swimming pool, is the large structure in the foreground. The remaining ...
  • Physical Education Complex Model 

    Unknown author (2009-03-03)
  • Pool 

    Unknown author (2009-03-03)
    Olympic size swimming pool in the Eleanor Misener Aquatic Centre.
  • Pool Filling 

    Unknown author (2009-03-03)
    Olympic size swimming pool gets filled with water.
  • Pool Foundation 

    Unknown author (2009-03-03)
    Exposed escarpment rock during the construction of the pool.
  • Pool Plans 

    Unknown author (2009-03-03)
    Herb de Bray standing at the edge of the soon to be completed pool of the Elanor Misner Aquatic Center.
  • Steel Reinforcing Bars 

    Unknown author (2009-03-03)
    Steel reinforcing bars used in the construction of the walls for the Aquatic Centre.
  • Structural Work 

    Unknown author (2009-03-03)
    Construction on the Aquatic Centre progresses and concrete walls go up.
  • Wall and Pillar Construction 

    Unknown author (2009-03-03)
    Construction of the concrete walls and pillars for the Aquatic Centre.
  • Wall Construction 

    Unknown author (2009-03-03)
    Pouring the concrete during the construction of the walls for the Aquatic Centre.