Digital Repository

Browsing Physical Education Building by Title

DSpace/Manakin Repository

Browsing Physical Education Building by Title

Sort by: Order: Results:

  • Unknown author (2009-03-03)
    Pouring the concrete in the construction of the Eleanor Misener Aquatic Centre.
  • Unknown author (2009-03-03)
    The steel, rock, and conrete foundation of the Aquatic Centre.
  • Unknown author (2009-03-03)
    Work on the giant concrete pillars found in the Eleanor Misener Aquatic Centre.
  • Unknown author (2009-03-03)
    Construction of the concrete walls and pillars for the Aquatic Centre progress.
  • Unknown author (2009-03-03)
    An artist's sketch of what the Physical Education Building was to look like.
  • Unknown author (2009-03-03)
  • Unknown author (2009-03-03)
    View of the pool inside the Eleanor Misener Aquatic Centre.
  • The Cage 
    Unknown author (2009-03-03)
    The equipment and store room of Brock's Physical Education Complex.
  • Unknown author (2009-03-03)
    Forms and reinforcing steel bars used in the walls of the Aquatic Centre.
  • Unknown author (2009-03-03)
    Early groundwork at the site of the Physical Education Building.
  • Unknown author (2009-03-03)
    Eleanor Misener was Ralph Misener's mother and it is she that the Aquatic Centre is named after. Ralph Misener was the fourth Chancellor of Brock University.
  • Unknown author (2009-03-03)
    The Brock pool as it begins to be filled with water.
  • Unknown author (2009-03-03)
    Construction work taking placce at the site of the Aquatic Centre.
  • Unknown author (2009-03-03)
  • Unknown author (2009-03-03)
    Work on the foundation and pillars of the Aquatic Centre.
  • Unknown author (2009-03-03)
    Work on the foundation for the Aquatic Centre around 1980.
  • Unknown author (2009-03-03)
    Herb de Bray standing in the yet to be filled Olympic sized swimming pool.
  • Unknown author (2009-03-03)
    View from just outside the front of the Phys. Ed. Complex. This area is now part of a courtyard found in the centre of the Walker Complex.
  • Unknown author (2009-03-03)
    Construction of the Physical Education Building progresses.
  • Unknown author (2009-03-03)

Search The Repository


Browse

My Account

Statistics


About the Digital Repository