Digital Repository

Browsing Physical Education Building by Issue Date

DSpace/Manakin Repository

Browsing Physical Education Building by Issue Date

Sort by: Order: Results:

  • Unknown author (2009-03-03)
    The steel, rock, and conrete foundation of the Aquatic Centre.
  • Unknown author (2009-03-03)
    Work on the foundation and pillars of the Aquatic Centre.
  • Unknown author (2009-03-03)
    Construction of the concrete walls and pillars for the Aquatic Centre progress.
  • Unknown author (2009-03-03)
    Construction of the concrete walls and pillars for the Aquatic Centre.
  • Unknown author (2009-03-03)
    Olympic size swimming pool gets filled with water.
  • Pool 
    Unknown author (2009-03-03)
    Olympic size swimming pool in the Eleanor Misener Aquatic Centre.
  • Unknown author (2009-03-03)
    View of the pool inside the Eleanor Misener Aquatic Centre.
  • The Cage 
    Unknown author (2009-03-03)
    The equipment and store room of Brock's Physical Education Complex.
  • Unknown author (2009-03-03)
  • Unknown author (2009-03-03)
    Eleanor Misener was Ralph Misener's mother and it is she that the Aquatic Centre is named after. Ralph Misener was the fourth Chancellor of Brock University.

Search The Repository


Browse

My Account

Statistics


About the Digital Repository