Physical Education Building
Browse by
Completed in 1973, the original Physical Education Building consisted of 2 gymnasiums, 5 squash courts, a handball court, and other facilities. Future additions to the complex took place in 1980, when the Eleanor Misener Aquatic Centre was added featuring an olympic size pool, in 1995, when the Leo LeBlanc Rowing Centre was added, and in 2002 when the Walker Complex addition was added. This large addition consists of a track, a 4 basketball-court gymnasium field house (now known as the Ian D. Beddis Gymnaisum), 'the Zone' gym, and various other facilities. At this point in time the Physical Education Complex as a whole was renamed the Walker Complex. The two names will be used interchangeably in this gallery however.
Recent Submissions
-
Eleanor Misenercirca 1981Eleanor Misener was Ralph Misener's wife and it is she that the Aquatic Centre is named after. Ralph Misener was the fourth Chancellor of Brock University.
-
The Cagen.d.The equipment and store room of Brock's Physical Education Complex.
-
Brock Poolcirca 1981View of the pool inside the Eleanor Misener Aquatic Centre.
-
Brock Poolcirca 1981Olympic size swimming pool in the Eleanor Misener Aquatic Centre.
-
Filling Brock Poolcirca 1981Brock Olympic size swimming pool gets filled with water.
-
Aquatic Centre Wall and Pillar Constructioncirca 1980Construction of the concrete walls and pillars for the Aquatic Centre.
-
Aquatic Centre Wallscirca 1980Construction of the concrete walls and pillars for the Aquatic Centre progress.
-
Aquatic Centre Foundation and Pillar workcirca 1980Work on the foundation and pillars of the Aquatic Centre.
-
Aquatic Centre Foundationcirca 1980The steel, rock, and conrete foundation of the Aquatic Centre.
-
Aquatic Centre Excavation Workcirca 1980Construction work taking place at the site of the Aquatic Centre.
-
Aquatic Centre Wall Constructioncirca 1980Pouring the concrete during the construction of the walls for the Aquatic Centre.
-
Aquatic Centre Steel Reinforcing Barscirca 1980Steel reinforcing bars used in the construction of the walls for the Aquatic Centre.
-
Aquatic Centre Constructioncirca 1980Pouring the concrete in the construction of the Eleanor Misener Aquatic Centre.
-
Aquatic Centre Concrete Formscirca 1980Forms and reinforcing steel bars used in the walls of the Aquatic Centre.
-
Aquatic Centre Pillarscirca 1980Work on the giant concrete pillars found in the Eleanor Misener Aquatic Centre.
-
Aquatic Centre Structural Workcirca 1980Construction on the Aquatic Centre progresses and concrete walls go up.
-
Aquatic Centre Foundation Workcirca 1980Work on the foundation for the Aquatic Centre around 1980.
-
Pool Foundationcirca 1980Exposed escarpment rock during the construction of the pool.
-
Blueprintsn.d.