Completed in 1973, the original Physical Education Building consisted of 2 gymnasiums, 5 squash courts, a handball court, and other facilities. Future additions to the complex took place in 1980, when the Eleanor Misener Aquatic Centre was added featuring an olympic size pool, in 1995, when the Leo LeBlanc Rowing Centre was added, and in 2002 when the Walker Complex addition was added. This large addition consists of a track, a 4 basketball-court gymnasium field house (now known as the Ian D. Beddis Gymnaisum), 'the Zone' gym, and various other facilities. At this point in time the Physical Education Complex as a whole was renamed the Walker Complex. The two names will be used interchangeably in this gallery however.

Recent Submissions

  • Eleanor Misener 

    Unknown author (2009-03-03)
    Eleanor Misener was Ralph Misener's mother and it is she that the Aquatic Centre is named after. Ralph Misener was the fourth Chancellor of Brock University.
  • Physical Education Complex Model 

    Unknown author (2009-03-03)
  • The Cage 

    Unknown author (2009-03-03)
    The equipment and store room of Brock's Physical Education Complex.
  • Brock Pool 

    Unknown author (2009-03-03)
    View of the pool inside the Eleanor Misener Aquatic Centre.
  • Pool 

    Unknown author (2009-03-03)
    Olympic size swimming pool in the Eleanor Misener Aquatic Centre.
  • Pool Filling 

    Unknown author (2009-03-03)
    Olympic size swimming pool gets filled with water.
  • Wall and Pillar Construction 

    Unknown author (2009-03-03)
    Construction of the concrete walls and pillars for the Aquatic Centre.
  • Aquatic Centre Walls 

    Unknown author (2009-03-03)
    Construction of the concrete walls and pillars for the Aquatic Centre progress.
  • Foundation and Pillar work 

    Unknown author (2009-03-03)
    Work on the foundation and pillars of the Aquatic Centre.
  • Aquatic Centre Foundation 

    Unknown author (2009-03-03)
    The steel, rock, and conrete foundation of the Aquatic Centre.
  • Excavation Work 

    Unknown author (2009-03-03)
    Construction work taking placce at the site of the Aquatic Centre.
  • Wall Construction 

    Unknown author (2009-03-03)
    Pouring the concrete during the construction of the walls for the Aquatic Centre.
  • Steel Reinforcing Bars 

    Unknown author (2009-03-03)
    Steel reinforcing bars used in the construction of the walls for the Aquatic Centre.
  • Aquatic Centre Construction 

    Unknown author (2009-03-03)
    Pouring the concrete in the construction of the Eleanor Misener Aquatic Centre.
  • Concrete Forms 

    Unknown author (2009-03-03)
    Forms and reinforcing steel bars used in the walls of the Aquatic Centre.
  • Aquatic Centre Pillars 

    Unknown author (2009-03-03)
    Work on the giant concrete pillars found in the Eleanor Misener Aquatic Centre.
  • Structural Work 

    Unknown author (2009-03-03)
    Construction on the Aquatic Centre progresses and concrete walls go up.
  • Foundation Work 

    Unknown author (2009-03-03)
    Work on the foundation for the Aquatic Centre around 1980.
  • Pool Foundation 

    Unknown author (2009-03-03)
    Exposed escarpment rock during the construction of the pool.
  • Blueprints 

    Unknown author (2009-03-03)