Now showing items 1-20 of 58

  • Academic Staging Building 

    Unknown author (2009-02-27)
    A view from the main parking lot near the time of completion of the complex.
  • Mackenzie Chown B Block 

    Unknown author (2009-02-27)
    Mackenzie Chown Complex in the background and the path running next to it.
  • Mackenzie Chown Overhead 

    Unknown author (2009-02-27)
    Overhead view of the Mackenzie Chown Complex.
  • Mackenzie Chown Path 

    Unknown author (2009-02-27)
    Path running next to the Mackenzie Chown Complex.
  • Mackenzie Chown Path 

    Unknown author (2009-02-27)
    View of the Complex and the path running along it from the east.
  • C Block ceiling 

    Unknown author (2009-02-27)
    View of the ceiling and skylights found in C Block.
  • Enclosed Bridge 

    Unknown author (2009-02-27)
    One of the so called enclosed bridges connecting modules of the Mackenzie Chown Complex.
  • A Block Corridor 

    Unknown author (2009-02-27)
    Main corridor in Mackenzie Chown A Block.
  • Lounge Area 

    Unknown author (2009-02-27)
    One of the lounge areas situated on the enclosed bridges.
  • Skylights 

    Unknown author (2009-02-27)
    Skylights on the roof of the Mackenzie Chown Complex.
  • Mackenzie Chown Exterior 

    Unknown author (2009-02-27)
    Exterior view of the complex and surrounding environment.
  • Mackenzie Chown Moduel 

    Unknown author (2009-02-27)
    One of the so called diamond shaped modules of the Mackenzie Chown Complex.
  • Complex Model 

    Unknown author (2009-02-27)
    Mackenzie Chown Complex model.
  • Complex Model 

    Unknown author (2009-02-27)
    View of the Mackenzie Chown Complex model from above.
  • Science Complex Model 

    Unknown author (2009-02-27)
    A model showing the Mackenzie Chown complex and the H Block addition.
  • Early Construction 

    Unknown author (2009-02-27)
    Work on service tunnels and foundations for the Mackenzie Chown Complex.
  • Early Construction 

    Unknown author (2009-02-27)
    View of the service tunnel and foundation construction in October 1971.
  • Complex takes shape 

    Unknown author (2009-02-27)
    View of the progress of the Mackenzie Chown Complex several months into construction.
  • Concrete Wall 

    Unknown author (2009-02-27)
    View of the construction of a concrete wall.
  • Stone Exterior 

    Unknown author (2009-02-27)
    The concrete wall gets its exterior finished in stone.